FSSS (Furnace Safeguard Supervisory System)
FSSS LOGIC SYSTEM BOILER START- UP SEQUENCE The boiler can be placed in service, initially or after a “Master Fuel Trip,” in the following sequence through FSSS. Furnace Purge:- BeforeRead More
High Pressure Bypass Fast open Condition
Turbine trip GCB open LSR operated Emergency fast open push button pressed Pressure deviation high ( actual pressure- HPBP pressure setpoint => 8ksc)
Analysis of the statement on mill outlet temperature:
Points in favor of higher mill outlet temperature (up to 100 – VM): Risks and precautions for high mill outlet temperature: Overall recommendation: Running the mill at a higher outletRead More
How Flue Gas Exit Temperature Impacts Coal Mill Performance
The efficiency of a coal-fired power plant hinges on optimal heat transfer throughout the system. One crucial factor in this equation is the flue gas exit temperature, which indirectly affectsRead More
MAHARASHTRA STATE BOILER OPERATION ENGINEERING EXAM 2013
Maharashtra state boiler operation engineering exam 2013 objective question with solution.In 2013, only Paper-1 contained objective questions, while Paper-2 and Paper-3 had no objective questions.