High Pressure Bypass Fast open Condition

Turbine trip GCB open LSR operated Emergency fast open push button pressed Pressure deviation high ( actual pressure- HPBP pressure setpoint => 8ksc)

FSSS (Furnace Safeguard Supervisory System)

FSSS LOGIC SYSTEM BOILER START- UP SEQUENCE The boiler can be placed in service, initially or after a “Master Fuel Trip,” in the following sequence through FSSS. Furnace Purge:- Before any fuel firing can takes place, initially or following a boiler trip, a satisfactory “Purge Cycle” must be completed. Initially,Read More

MAHARASHTRA STATE BOILER OPERATION ENGINEERING EXAM 2013

Maharashtra state boiler operation engineering exam 2013 objective question with solution.In 2013, only Paper-1 contained objective questions, while Paper-2 and Paper-3 had no objective questions.

STEAM TURBINE SOAKING

The soaking period in a steam turbine is the time it takes for all of the turbine’s internal parts to reach the same temperature before it is started up. This is important because steam turbines are very large and complex machines, and the different parts of the turbine expand atRead More

RAJASTHAN BOILER OPERATION ENGINEER EXAM-2018 (PAPER-1 & 2 ) WITH SOLUTION